Louisiana/WestFeliciana
Code of Ordinances | Zoning GIS & GIS | Clerk of Court & Record Search | Permits | Construction Checklist | Fee Schedule | Planning & Zoning Fees | Building Code |
Municipalities:
Town: St. Francisville (parish seat and only municipality)
Unincorporated communities
Louisiana State Penitentiary (Angola) | Bains | Tunica | Wakefield
Code | Zoning | Front | Side | Rear |
R-A | Residential-Agricultural District | |||
R-1 | Low-Density Residential District | |||
R-2 | General Residential District | |||
R-3 | High-Density Residential District | |||
R-4 | Recreation Residential District | |||
T-R | Townhouse Residential District | |||
A-R | Apartment Residential District | |||
M-R | Multiple Story Residential District | |||
SEE TABLE FOR SETBACKS. Click links below. | ||||
Permitted Uses in Res Dists. | ||||
Lot & Structure Requirements | ||||
Single- and two-family residences in a T-R, A-R, M-R, C-1, C-2, C-3, C-4, M-1, M-2 and P-1 districts shall comply with the requirements of R-3 districts. | ||||
Local roads are defined as not arterials or collectors according to the major street plan. OFF-STREET PARKING REQUIREMENTS |
Building Permit Requirments:
- 911 Address-(225) 784-3653
- Survey of Property
- Recorded Deed
- Zoning Verification
- Engineer stamped plans
- Culvert Permit - Link has pipe specs
- Floodplain Development Permit (all areas of special flood hazard)
- Preliminary Elevation, Form board & Final elevation Certificates (flood zone only)
- Plot plan by CT Homes- must include information from survey.
- Onsite Wastewater Permit from LA Dept. of Health:
- 5154 Burnett Road, St. Francisville, LA. 70075. West Feliciana Unit: 225-635-2165
Certificate of occupancy:
Notes:
Floodplain Notes: Residential construction. New construction and substantial improvement of any residential structure shall have the lowest floor (including basement), elevated to or above the base flood elevation. A registered professional engineer, architect, or land surveyor shall submit a certification to the floodplain administrator that the standard of this subsection as proposed in section 110-65(a)(1), is satisfied.
May have future Stormwater Impact Fee
A zoning verification is required for Building permits that do not require site plan review. It shall be unlawful to begin moving, constructing, altering or repairing (except ordinary repairs) any building or other structure on a site, including an accessory structure, until a zoning verification has been issued.
Gary Mego - Development Services Director (Permits & Inspections): 225-635-3864, Planning & Zoning : 225-784-3725