Setbacks for residential lots; All undeveloped residential lots of record shall follow these setback requirements, unless otherwise specified or as noted on the recorded plat of existing approved subdivisions.

  • Front setback lines shall be a minimum of 25 feet from the property line.
  • A setback of 35 feet is required for the entrance to any residential subdivision fronting on a parish or state road.
  • Side and rear setback shall be ten feet from property lines.
  • Special classification property development standards

Permit Requirements:

  • 911 Address- Call (985) 747-0911
  • Recorded Deed
  • Survey (not required by parish, but highly recommended!
  • Onsite Wastewater Permit - Amite Office - (985) 748-2024, Hammond Office - (985) 543-4175 Tangi Sewer District- (985) 542-8877.
  • Floodplain Determination OR Preliminary Elevation Certificate
  • Form Board Certificate (SFHA Only)
  • Final Elevation Certificate (SFHA Only)
  • SWPP/Stormwater.
    • Development drainage requirements:
  1. Any development located within an identified drainage district must receive approval by that entity and provide a copy of the approved drainage plan at the time of final plan submission for approval by the planning commission.
  2. All areas outside of a parish drainage district authority shall follow the stormwater requirements and the flood prevention and protection requirements of article IX of this chapter | Flood Hazard Reduction
  • Plot/ Site Plan by CT Homes
  • Driveway/ Culvert Permit
  • 5 acres or more- Land Clearing Permit



Permits are required for subcontractors