Tangipahoa/VillageofTangipahoa
From Townsend Management Group Permit Database
Village Of Tangipahoa | Code Of Ordinances | Fee Schedule |
Setbacks for residential lots; All undeveloped residential lots of record shall follow these setback requirements, unless otherwise specified or as noted on the recorded plat of existing approved subdivisions.
- Front setback lines shall be a minimum of 25 feet from the property line.
- A setback of 35 feet is required for the entrance to any residential subdivision fronting on a parish or state road.
- Side and rear setback shall be ten feet from property lines.
- Special classification property development standards
Permit Requirements:
- 911 Address- Call (985) 747-0911
- Recorded Deed
- Survey (not required by parish, but highly recommended!
- Onsite Wastewater Permit - Amite Office - (985) 748-2024, Hammond Office - (985) 543-4175 Tangi Sewer District- (985) 542-8877.
- Floodplain Determination OR Preliminary Elevation Certificate
- Form Board Certificate (SFHA Only)
- Final Elevation Certificate (SFHA Only)
- SWPP/Stormwater.
- Development drainage requirements:
- Any development located within an identified drainage district must receive approval by that entity and provide a copy of the approved drainage plan at the time of final plan submission for approval by the planning commission.
- All areas outside of a parish drainage district authority shall follow the stormwater requirements and the flood prevention and protection requirements of article IX of this chapter | Flood Hazard Reduction
- Plot/ Site Plan by CT Homes
- Driveway/ Culvert Permit
- 5 acres or more- Land Clearing Permit