Mississippi/Picayune
From Townsend Management Group Permit Database
Resources:
Permit Requirements:
- Picayune Building Permit Application
- Parcel Number and 911 Address
- Two Complete Set of Plans (One digital, One Physical)
- Floor, Foundation, Electrical plans including service & panel locations,
- Building elevations
- All plumbing fixture locations (Cross connection Backflow Preventers)
- If over 5000Sq.Ft. Must be Architect/Engineer stamped
- Flood Zone Information
- Elevation Certificate (If in Flood Zone)
- Plot Plan by CT Homes with proposed & existing buildings, all Setbacks & Size of driveway
- Septic/Plumbing Permit-601-789-9777 Application
- Electrical Permit Application
- Mechanical Permit Application
- Water Tap, Gas Tap, Sewer tap receipts