Mississippi/Picayune

From Townsend Management Group Permit Database

Resources:

Code Of Ordinances

City of Picayune

Zoning Lot Requirements

Document Center

Utilities in the area


Permit Requirements:

  1. Picayune Building Permit Application
  2. Parcel Number and 911 Address
  3. Two Complete Set of Plans (One digital, One Physical)
    • Floor, Foundation, Electrical plans including service & panel locations,
    • Building elevations
    • All plumbing fixture locations (Cross connection Backflow Preventers)
    • If over 5000Sq.Ft. Must be Architect/Engineer stamped
    • Flood Zone Information
  4. Elevation Certificate (If in Flood Zone)
  1. Plot Plan by CT Homes with proposed & existing buildings, all Setbacks & Size of driveway
  2. Septic/Plumbing Permit-601-789-9777 Application
  3. Electrical Permit Application
  4. Mechanical Permit Application
  5. Water Tap, Gas Tap, Sewer tap receipts