Livingston/DenhamSprings
From Townsend Management Group Permit Database
City of Denham Springs | Code Of Ordinances | Building Permit | Permit Fee Schedule | Project Folder Checklist |
Zoning Diagram R-1, R-2, R-3 | Zoning Map | Zoning Ordinances
- 911 Address-
- Recorded Deed
- Survey of Property
- Preliminary Elevation Certificate/ Flood Zone Determination (In Flood Zone)
- Under Construction Elevation Certificate (In Flood Zone)
- Final Elevation Certificate (Everyone)
- Floodplain Permit (if in flood zone)
- SWPPP
- Electrical | Mechanical | Plumbing | WasteWater Permits
- Compaction Certification (If site is built up)
- Post Tension Certification
- Termite Certification
Applications/May Need Permits:
- Application for Utility Services | Senior Fee Discount(65+)
- Affidavit and Certification of Inspection
- Contractors License Application
- Residential Driveway Specifications
- Louisiana DOTD – District 62, (800) 545-9280 or (985) 375-0100 (If on Hwy)
- Livingston Parish Gravity Drainage District 1,
- plat/site plan for single-family dwelling development, to LPGDD1. Call (225) 664-5827
- In open ditch subdivisions, contact the City of Denham Springs Street Department, (225) 667-8342, for Driveway Drainage Pipe Permit
- Landscape Ordinance (Only if Development that requires the issuance of a building permit for a building addition amounting to more than 50 percent of existing street facade)
- Demolition | Generators , Permit Requirements for Generators | Signs |
- Permit requirements (accessory structure)-
- Fireplaces, Garages, Carports etc.
- Home Occupation Permit Application | Occupancy Permit Application | Temporary Occupancy
- Duct Leakage Verification form | Affidavit for temp- perm Electric service | Energy Conservation Certificate
- Historic District Certification
Drafting Notes:
List of Approved Engineers | II.Architectural Requirements | Applicable Construction Codes and Editions
Foundation shall be below frost line. ( 4" below undisturbed soil) minimum. The minimum depth of footings below the undisturbed ground surface shall be 12". The minimum width of footings shall be 12".