Baldwin/Fairhope

From Townsend Management Group Permit Database


Permit Portal | GIS | Utilities | Forms & Ordinances | Building and Permitting | Planning Publications & Forms | Fees | Zoning Ordinance | Stormwater Management Program


There is a histoic district & Commity


Building Permit

  1. 911 Address, Parcel# & PPIN
  2. Deed
  3. RESCheck
  4. Stamped Survey & Plotplan
  5. Stamped plans with truss pages
  6. Land Disturbance Permit(Everyone) / Red clay / Fill Restrictions
  7. Landscap Plan by Licensed Landscape Architect or state landscape designer
  8. Department of Health Onsite Wastewater Permit
  9. All elevation certificates if in flood zone
  10. Wetland Development Plan (If wetlands)
  11. R.O.W permit




Plans Must Include:

- Foundation plan (sealed by Professional Structural Engineer)

- Wall and roof framing details (sealed by Professional Structural Engineer)

- Truss plans (if applicable, sealed by Professional Structural Engineer)

- Architectural floor plan showing heated and cooled square footage totals

- Architectural elevations to verify building height

- Electrical plan showing receptacle spacing, switch locations, and diagram of electrical service

- Mechanical/HVAC plan (may be included on architectural floorplan)

- Plumbing plan

- Septic tan release from Baldwin County Health Department (if applicable)

- If in a floodplain, Elevation Certificates for each building on the site (house, garage, guesthouse, etc)

- If in a wetland, provide wetland delineation and Wetland Development Plan in compliance with Fairhope Ordinance 1370

Cookies help us deliver our services. By using our services, you agree to our use of cookies.